Cameron Street Remodel 2015
Jan 2015…Existing sidewalk, tree and yard. This is where the driveway will go
May 2015…Lowering the utilities to install an apron and driveway.
June 2015…New driveway apron installed
July 2015…Excavating the drive and front yard.
July 2015…The jungle is removed
July 2015…Rear addition demolished
August 2015…Excavation for rear addition and crawl space
August 2015…Porch and interior demolition